TECHNICAL CONSULTATION. With the possible exception of dry wells,
infiltration trenches, and inlet devices, the vegetated IMPs described here are integral to
a site's landscape design. Accordingly, they should be designed by, or under the direct
supervision of, an appropriate licensed professional such as a landscape architect.
8-16
DEVELOPMENT AND EVALUATION OF ADDITIONAL PRACTICES.
Additional practices not discussed in this UFC may also be appropriate for use as IMPs.
The practice's applicability, effectiveness, cost and maintenance requirements must be
considered in order to evaluate its potential use as an IMP.