UFC 3-250-12N
8 June 2005
CHAPTER 1
INTRODUCTION
1-1
PURPOSE AND SCOPE.
This UFC provides general criteria for the design of pavements.
This UFC is comprised of two sections. Chapter 1 introduces this UFC. Appendix A
contains the full text copy of Change 1 to DM 5.4. Appendix B contains the full text
copy of DM 5.4.
The information contained in Appendix A has not yet been updated, this includes
references. Use the latest UFC available from the Whole Building Design Guide
NAVFAC menu at this web page.
1-2
APPLICABILITY.
This UFC applies to all Navy service elements and Navy contractors.
1-2.1
GENERAL BUILDING REQUIREMENTS.
All DoD facilities must comply with UFC 1-200-01, Design: General Building
Requirements. If any conflict occurs between this UFC and UFC 1-200-01, the
requirements of UFC 1-200-01 take precedence.
1-2.2
SAFETY.
All DoD facilities must comply with DODINST 6055.1 and applicable Occupational
Safety and Health Administration (OSHA) safety and health standards.
NOTE: All NAVY projects, must comply with OPNAVINST 5100.23 (series), Navy
Occupational Safety and Health Program Manual. The most recent publication in this
series can be accessed at the NAVFAC Safety web site:
OPNAVINST 5100.23, the requirements of OPNAVINST 5100.23 take precedence.
1-2.3
FIRE PROTECTION.
All DoD facilities must comply with UFC 3-600-01, Design: Fire Protection Engineering
for Facilities. If any conflict occurs between this UFC and UFC 3-600-01, the
requirements of UFC 3-600-01 take precedence.
1-2.4
ANTITERRORISM/FORCE PROTECTION.
For antiterrorism requirements, refer to UFC 4-010-01, UFC 4-010-02 and/or Combatant
Commander Anti-terrorism/Force Protection construction standards. Project documents
1-1