1.
Silt fence
2.
Silt fence drop inlet protection
3.
Stone construction entrances
The location of the measures shall be in two (2) phases. Phase 1
shall consist of construction of the silt fence, construction
entrance, and inlet protection. These items will be in place
prior to any clearing and grading operations. Phase 2 will
consist of placing additional erosion-control measures to protect
new construction in addition to the surrounding environment.
These will remain in place until permanent stabilization is
achieved.
Permanent storm water pollution prevention measures include
seeding
and
mulching.
The
Contractor
shall
also
install
protective measures to direct surface water away from open
exhibiting
indications
of
These
requirements will be specified in Specification Section 02921 of
the Technical Specifications.
1.22
AIRCRAFT ARRESTING SYSTEM(S)
1.22.1
General
Provide a narrative description of all Aircraft Arresting System
work in the project, including type of system and whether the
equipment housing is to be installed above or below ground.
1.22.2
References
The 35E8-series Technical Orders include a separate order for
each type of aircraft arresting system. Include the 35E8-series
reference number for the type of system required and instructions
for obtaining a copy.
UFC 3-260-01, Airfield and Heliport Planning and Design, Chapter
3
AFI 32-1043, Managing,
Operating,
and
Maintaining
Aircraft
Correcting Systems
1.22.3
Government-Furnished Equipment
The Government will furnish Aircraft Arresting Gear equipment,
delivered to the job site, in conformance with the equipment list
in the Government-Furnished Design Analysis.
01016 - 24