UFC 3-300-10N
25 May 2005
2-4.1
General. Quality Assurance / Quality Control must be in accordance with
UFC 1-200-01. This will include inspection and testing, and may include a Quality
Assurance Plan and Structural Observations where applicable.
2-4.1.1 When warranted by the project scope, the structural engineer of record shall
require additional inspections, tests, certifications, documentation and observation,
beyond those required by UFC 1-200-01. Additional inspections, tests, certifications,
documentation, or observations may be required for proprietary materials and systems.
2-4.1.2 The construction documents must contain a list of all required special
inspection, field tests, laboratory tests, certifications, documentation, and field
observation.