Table 11
Total Energy Reconciliation
Energy Use Component
Natural
Fuel
(b)
kWh
Gas,
Oil,
kBtu
kBtu
Metered Building Energy
40,125
73,120
Estimated Building Energy
431,463
101,679
Metered Ship Energy
0
0
Estimated Ship Energy
513,900
963
Elec. Trans. & Dist.
4,005
0
Losses
Central Plant Efficiency &
5,000
1,000
Dist. Losses
Street and Exterior Lights
8,316
0
Process Energy
0
0
Water and Sewer Energy
25,000
0
12,000
0
Energy Transfers to Off-
0
0
Site
Misc. Other Energy Use
0
0
(not assoc. with above)
ESTIMATED TOTAL:
1,039,809 176,762
BILLED TOTAL:
1,254,650 163,000
Difference (Billed -
214,841 -13,762
Estimated):
Adjustment Factor (a):
1.227
0.866
(a) "Adjustment Factor" = [1+(Difference (billed -
Estimated)/sum of selected Energy Use Components)]. The
selected Energy Use Components are those energy use areas to
which the reconciliation difference is to be allocated. In
this example, selected components are estimated building energy
and estimated ship energy.
(b) Data for other fuel types are entered into additional
columns.
34