Table 7 (Continued)
Method of Calculating Coincident Peak Demand
730 10
Fire station .........
14.6
30
4.4
15
521
2.3
Total
3,325
System loss (6%)
194
Grand total
3,429
(1) The coincidence factor has been increased to allow for low load factor and
number of facilities in the area. Refer to para. 2.3.2.4, Influencing
Factors, of this handbook.
(2) The coincidence factor has been increased because of the relative
magnitude of the load. Refer to para. 2.3.2.5, Individual Loads, of this
handbook.