16
PART 1
UFC 3-701-05
March 2005
Cost Factors ($FY05)
Inventory records
Construction
Sustainment
Upper limit
Reset
Code
Title
UM
Type
Description
Value
Airfield Pavement
.77
.30
300,000
8,000
Lighting on the sides and approaches of airfield pavements. Does not include other airfield
1361
LF
S
lighting, such as perimeter lighting, security lighting, and street and parking lighting. CCF is
Lighting
derived from AFCESA data. SCF is derived from RS Means data.
Airfield Lighting
,400.48
.48
650
4
Other lighting directly related to aviation operations that is not airfield pavement lighting
1362
EA
S
included in Facility Analysis Category 1361. CCF is derived from Air Force and RS Means
data. SCF is based on the ratio for FAC 1361.
Ship Navigation
5.62
.85
42,000
1,300
A building that contains ship navigation and traffic control equipment and functions.
1371
SF
B
Equipment located in these facilities is not real property and is not included in this Facility
Building
Analysis Category. CCF is derived from USACE data. SCF is derived from a DoD
developed template based on the DoD average size of 4,743 SF, and run through the
Whitestone MARS model.
Ship Navigation
,497.75
.50
6
1
A facility, other than a building, that supports ship navigation and traffic control operations.
1381
EA
S
Cost factors are based upon an Ocean Science Group SL125C beacon with buoy and anchor
Facility
system. CCF is derived from data provided by Ocean Science Group. SCF is based on the
ratio for FAC 1351.
Air Defense
6.21
.32
200,000
4,000
A building containing equipment and functions directly related to air defense operations.
1402
SF
B
Equipment located in these facilities is not real property and is not included in this Facility
Operations Building
Analysis Category. CCF is derived from Air Force data. SCF is derived from a DoD
developed template based on the DoD average size of 9,024 SF, and run through the
Whitestone MARS model.
Missile Operations
9.85
.19
45,000
500
A building containing equipment and functions directly related to guided missile operations.
1403
SF
B
Equipment located in these facilities is not real property and is not included in this Facility
Building
Analysis Category. CCF is derived from Air Force data. SCF is derived from a DoD
developed template based on the DoD average size of 1,398 SF, and run through the
Whitestone MARS model.
Emergency
9.89
.44
85,000
4,000
A building or part of a building from which commanders and their representatives can direct
1404
SF
B
operations, control forces during emergencies, or in which sensitive classified materials are
Operations Center /
reviewed and stored. CCF is derived from USACE data. SCF is derived from a DoD
SCIF
developed template based on the DoD average size of 6,884 SF, and run through the
Whitestone MARS model.
Airfield Fire And
6.09
.49
30,000
3,500
A building containing the personnel and equipment that provides fire and rescue support to
1411
SF
B
the airfield. Equipment located in these facilities is not real property and is not included in
Rescue Station
this Facility Analysis Category. CCF is derived from AFCESA data. SCF is derived from a
DoD developed template based on the DoD average size of 5,425 SF, and run through the
Whitestone MARS model.
Aviation Operations
6.26
.31
400,000
4,500
A building containing functions that are directly related to aviation operations. CCF is
1412
SF
B
derived from AFCESA data. SCF is derived from a DoD developed template based on the
Building
DoD average size of 8,095 SF, and run through the Whitestone MARS model.
Air Control Tower
3.22
.92
25,000
2,000
A facility containing the equipment and functions directly related to the control of aviation
1413
SF
B
traffic. Facility typically contains an elevated observation deck with all-around observation.
Equipment located in these facilities is not real property and is not included in this Facility
Analysis Category. CCF is derived from AFCESA data. SCF is derived from a DoD
developed template based on the DoD average size of 2,372 SF, and run through the
Whitestone MARS model.