MIL-HDBK-1027/4A
Page
2.2.4.1
Roads, Parking, and Walkways........................25
2.2.4.2
Handicapped Access..................................25
2.2.4.3
Loading Dock Ramp Protection........................26
2.2.5
Structural..........................................26
2.2.5.1
Clearspan Requirements..............................26
2.2.5.2
2.2.5.3
Floors..............................................26
2.2.5.4
Roof Loads..........................................27
2.2.6
2.2.6.1
Design Conditions...................................28
2.2.6.2
Ventilation.........................................28
2.2.6.3
Zoning, System Selection and Part Load Performance..28
2.2.6.4
Special Requirements for WTT and OFT................28
2.2.6.5
Controls............................................29
2.2.6
Trenches............................................29
2.2.7
Plumbing............................................29
2.2.7.1
Hydraulic Support and Pump Rooms....................30
2.2.7.2
Trenches............................................30
2.2.7.3
Compressed Air......................................30
2.2.7.4
Electric Water Coolers..............................31
2.2.7.5
Waste Systems.......................................31
2.2.8
Electrical..........................................31
2.2.8.1
Closed Circuit Television...........................31
2.2.8.2
Telecommunications..................................31
2.2.8.3
Warning Lights and Signal Circuits..................31
2.2.8.4
Computers and Training Devices......................31
2.2.8.5
Lighting............................................32
2.2.8.6
2.2.8.7
Facility Low Voltage Power..........................32
2.2.8.8
Intrusion Detection System (IDS)....................32
2.2.8.9
Uninterruptible Power Supply (UPS)..................33
2.2.8.10
400 Hz Power........................................33
2.2.8.11
Facility Shielding..................................33
2.2.8.12
Grounding...........................................33
2.2.9
Fire Protection.....................................33
2.2.10
Safety..............................................34
2.2.11
Security............................................35
2.3
Collateral Equipment................................35
2.3.1
Collateral Equipment List...........................35
2.3.2
Furniture/Equipment Footprint.......................36
2.3.3
Training Aids.......................................36
2.3.3.1
Special Training Device Requirements................36
2.3.3.2
Personal Computer (PC) Stations.....................36
2.3.3.3
Audiovisual Requirements............................36
2.3.3.4
Electronic Information Delivery Systems (EIDS)......37
2.4
Supporting Functions and Utilities..................37
2.5
Supporting Personnel................................37
2.6
Special Contractor Support Spaces...................37
2.7
Environmental Requirements..........................37
vi