UFC 4-213-02
19 June 2003
Table 25 San Diego Naval Station Drydock No. 1
Date Completed
Suitable for Docking
Foundation
Construction Material
1942
AS
Earth
Concrete
Closure
Caisson, steel (rectangular box type).
Dewatering Pumps
Two 54", 800 hp, 220,000 gpm. Time to dewater: 130 min
Two 14", 200 hp, 7,000 gpm
Through culverts. Time to flood: 60 min
Captstans
7 total: 1 at head, 1 each side of entrance, 30 fpm at 36k;
2 each side, 30 fpm at 12k
Portal Crane Maximum Capacities and Heights
All crane requirements must be provided by theuser of the dock with mobile cranes
Ship and Industrial Services Furnished at Dock
Electrical
Volts
Amp
8 north side and 8 south side
3200
480
Ac, 3 Ph, 60 Hz
at 400 amps each
4 north side and 4 south side
100
115/230
Ac, 1 Ph, 60 Hz
at 15 amp duplex each
2 each at east end
200
120/208
Ac, 3 Ph, 60 Hz
1 at south side
60
115/230
Ac, 3 Ph, 60 Hz
Fresh water_________6" mains, 1,500 gpm at 80 psi, five
2-1/2" outlets each side
Salt water_________ _All saltwater requirements must be provided by the user of the
Dock with portable pumps
Fire Protection _______Fire alarm pull boxes connected to the base fire alarm
System/fire department, three each side. Also see saltwater
Compressed Air______6" mains, 7,500 cfm at 100 psi, five 2-1/2" outlets each side
Steam___ __________ 6" mains, 30,000 phr at 130 psi, five 2-1/2" outlets each side
Sanitary sewer ______ 8" mains, 900 gpm, three 4" inlets each side
56