TABLE 3
Typical Utility Requirements
Facility
100 Seat
300 Seat
500 Seat
Chapel with
Chapel with
Chapel with
Rel. Ed. Fac.
Rel. Ed. Fac.
Rel. Ed. Fac.
Area
7,000 sq.ft.
13,250 sq.ft.
21,000 sq.ft.
650 m2
1,230 m2
1,930 m2
Electrical load
no
with
no
with
no
with
A/C
A/C
A/C
A/C
A/C
A/C
Connected KVA
61.0
101.1
99.6
208.3
143.0 304.
Est. demand KW
55.0
118.9
89.7
177.1
128.7 258.
Water
(no fire
protection)
Total demand
35 gpm
40 gpm
52 gpm
(132 Lpm)
(150 Lpm)
(195 Lpm)
Hot water
demand
145 gph
250 gph
325 gph
(547 Lph)
(940 Lph)
(1230 Lph)
* Hot water
storage
120 g (440 L)
85 g (320 L)
170 g (642 L
Heating
Outside temp.
20 deg.F
(-7 deg.C) 20 deg.F (-7 deg.C) 20 deg.F (-7 de
Inside temp.
170 deg.F (21 deg.C) 70 deg.F (21 deg.C) 70 deg.F (21 de
Max. BTU/hr.
299,300
519,400
781,500
Cooling
Outside temp.
93 deg.F (34 deg.C) 93 deg.F (34 deg.C) 93 deg.F (34 de
Inside temp.
78 deg.F (26 deg.C) 78 deg.F (26 deg.C) 78 deg.F (26 de
Max. BTU/hr.
342,500
648,800
969,900
The above data re for estimating purposes. They assume a hypothetical
location at Norfolk, VA for each of the four facilities used as typical in this
manual. 20% glass area is assumed.
* The apparent inconsistency in the relative capacities of hot water
storage derives from efficiencies in heating units; low requirements may best
be met with small heating units and larger tanks.