(R) = Real Property Installed Equipment (RPIE). RPIE is purchased and installed with construction project
funds. All other listed equipment is purchased with equipment funds and installed with either construction
project or equipment funds. Infrastructure to support all types of equipment should be included in the
construction contract.
6-2
Food Service
6-2.1 Programming Menu
The following menu indicates the range of food that the kitchen should be able to produce.
Each facility may develop other menu items or establish themes based on local specialties.
The kitchen illustrated in the following section has been designed to serve at least the items
listed.
Table 6-3: Food Service Programming Menu