Home
Download PDF
Order CD-ROM
Order in Print
Home
>
UFGS CRITERIA - index
>
> 4_150_02
DESIGN: DOCKSIDE UTILITIES FOR SHIP SERVICE
Record of Changes - 4_150_020002
FOREWORD - 4_150_020003
CONTENTS - 4_150_020004
CONTENTS-continued - 4_150_020005
CONTENTS-continued - 4_150_020006
FIGURES - 4_150_020007
TABLES - 4_150_020008
CHAPTER 1. INTRODUCTION - 4_150_020009
CHAPTER 2. GENERAL UTILITY REQUIREMENTS
FIGURE 2-1 Typical Ship-Berth-Pier-Utilities Relationships
Hose and Cable Lengths
UTILITY CONNECTION GROUP DESIGN
Figure 2-2A Double-Deck Pier Example
Figure 2-2B Double-Deck Pier Example
Figure 2-2C Double-Deck Pier Example
PROTECTION - 4_150_020017
Protection of Utility Connections
Performance of POL and Hazardous Utilities
Supports - 4_150_020020
Cathodic Protection Systems (CPS)-continued - 4_150_020021
Cathodic Protection Systems (CPS)-continued - 4_150_020022
PAINT AND FINISH REQUIREMENTS
CHAPTER 3. ACTIVE AND REPAIR BERTHING
Table 3-1 Diversity Factors (DF) for Steam Usage
NOTES TO STEAM TABLE
Location and Arrangement of Piping Mains and Branches - 4_150_020027
Figure 3-1 Typical Steam Outlet Assembly
Specific Ship Requirements
Table 3-3 Bulk Shore Feedwater Quality Requirements
COMPRESSED AIR SYSTEMS - 4_150_020031
Figure 3-2 Schematic Steam Separator and Sampling Station
Piping System Design Criteria - 4_150_020033
Location and Arrangement of Piping Mains and Branches - 4_150_020034
Figure 3-3 Typical Compressed Air Outlet Assembly
SALTWATER OR NONPOTABLE WATER SYSTEMS
Justification Requirements
Demands and Pressure Requirements
Pumping Equipment
Drives
Piping and Outlets
CV, CVN, LHA, and LHD Requirements (All Classes)
Figure 3-4 Typical Salt or Non-Potable Water Outlet Assembly
POTABLE WATER SYSTEMS
Figure 3-5 International Shore Connection for Ship Fire Mains
Figure 3-6 Salt or Non-Potable Water for CV, CVN Classes at Pier
Piping System Design Criteria - 4_150_020047
Figure 3-7 Typical Potable Water Outlet Assembly
POL SYSTEMS
OILY WASTE SYSTEMS
Figure 3-8 Ship-to-Shore Oily Waste Hose Connection
Ship Oily Waste Generation
SEWAGE SYSTEMS
Wastewater Loadings - 4_150_020054
Effect of Wastewaters with High Seawater Content - 4_150_020055
Table 3-4 Typical Ship Sewage Concentrations
Pier and Wharf Systems
Figure 3-9 Pressure Manifold Schematic for Pier and Wharf Systems
Figure 3-10A Sewer Layout for Alternative Pier Types
Figure 3-10B Sewer Layout for Alternative Pier Types
Location Details
Figure 3-11A Typical Sewage Collection Facilities
Figure 3-11B Typical Sewage Collection Facilities
Figure 3-12A Details for Sewage Collection Facilities
Figure 3-12B Details of Sewage Collection Facilities
Figure 3-13A Piping Details for Sewage Collection Facilities
Figure 3-13B Piping Details for Sewage Collection Facilities
Odor/Septicity Control - 4_150_020068
Figure 3-14 Ship-to-Shore Sewage Hose Components
Figure 3-15 Above Pier Hose Connection
Table 3-6. Special Pier Structures and Appurtenances
NOTES TO TABLE 3-6
Drydock Facilities - 4_150_020073
Figure 3-16A Typical Sewage System Layouts for Drydock Facilities
Figure 3-16B Typical Sewage System Layouts for Drydock Facilities
Figure 3-17A Underground Hose Connection
Figure 3-17B Underground Hose Connection
ELECTRICAL SYSTEMS - 4_150_020078
Secondary Power Systems
Location and Arrangement of Equipment
Figure 3-18 Typical Alternative Pier Electrical Equipment ArrangementsZ
Existing Pier Vaults
Distribution System Equipment and Materials
Substations for 4160 or 13,800 Volts Service
Primary Outlet Assemblies
Ships' Shore Power Requirements
Supplemental Requirements for Nuclear Submarines (SSN, SSBN)
Ground System
TELECOMMUNICATION SYSTEMS
Telephone Systems
PIER POWER METERING SYSTEMS
OTHER SERVICES
Figure 3-19 Block Diagram of Pier Structure
Figure 3-20 Pier Fiber Distribution Center
Figure 3-21 Pier Fiber Distribution Center EDC 1 Rear Detail Surface Pier
Figure 3-22 Pier Fiber Distribution Center EDC 1 Rear Detail Submarine Pier
Figure 3-23 Pier Fiber Distribution Center EDC 1 Front Detail Surface Pier
Figure 3-24 Pier Fiber Distribution Center EDC 1 Front Detail Submarine Pier
Figure 3-25 Fiber Optic Connectivity Riser Panel Detail
Figure 3-26 EDC Fiber Optic Patch Panel Surface Pier
Figure 3-27 EDC Fiber Optic Patch Panel Submarine Pier
Figure 3-28 Rubber Gasket Cutout Surface Pier
Figure 3-29 Rubber Gasket Cutout Submarine Pier
CHAPTER 4. SUPPLY AND AMMUNITION PIERS
CHAPTER 5. FUELING PIERS
CHAPTER 6. MISCELLANEOUS PROVISIONS
Protection in Regions III and IV
Protection in Region V
PIPING IDENTIFICATION
Table 6-1. Color Code for Shore-to-Ship Utility Connections
CHAPTER 7. U.S. ARMY REQUIREMENTS
Figure 7-1 Typical Water Supply Connection for an Army Pier
MISCELLANEOUS - 4_150_020113
APPENDIX A. REFERENCES - 4_150_020114
APPENDIX A. REFERENCES-continued - 4_150_020115
APPENDIX A. REFERENCES-continued - 4_150_020116
APPENDIX A. REFERENCES-continued - 4_150_020117
APPENDIX A. REFERENCES-continued - 4_150_020118
APPENDIX A. REFERENCES-continued - 4_150_020119
APPENDIX B. GLOSSARY - 4_150_020120
APPENDIX B. GLOSSARY-continued - 4_150_020121
APPENDIX C. CLIMATOLOGICAL DATA
Figure C-1 U.S. Winter Weather Severity by Region
Table C-1 Regional Weather Data
Table C-3 Freeze Protection by Insulation and Flushing
APPENDIX D. TYPICAL ELECTRICAL DIAGRAMS AND DETAILS
Figure D-1A Electrical System for a Double-Deck Pier
Figure D-1B (Electrical System for a Double-Deck Pier
Figure D-1C (Electrical System for a Double-Deck Pier
Figure D-1D (Electrical System for a Double-Deck Pier
Figure D-1E (Electrical System for a Double-Deck Pier
Figure D-1F (Electrical System for a Double-Deck Pier
Figure D-1G (Electrical System for a Double-Deck Pier
Figure D-1H (Electrical System for a Double-Deck Pier
Figure D-1I (Electrical System for a Double-Deck Pier
Figure D-2A Pier Electrical Distribution: Typical Vault System
Figure D-2B Pier Electrical Distribution: Typical Vault System
Figure D-2C Pier Electrical Distribution: Typical Vault System
Figure D-2D Pier Electrical Distribution: Typical Vault System
Figure D-2E Pier Electrical Distribution: Vault Ventilation and Drainage
Figure D-3A Portable Substation
Figure D-3B Portable Substation
Figure D-3C Portable Substation
Figure D-4A Ship Service Outlet Assembly
Figure D-4B Ship Service Outlet Assembly
Figure D-5A Pier Electrical Distribution for Temporary Services
Figure D-5B pier Electrical Distribution for Temporary Services
Figure D-5C Pier Electrical Distribution for Temporary Services
4_150_02