ufc-3-270-05O&M: PAVER -- CONCRETE SURFACED AIRFIELDS PAVEMENT CONDITION INDEXO&M: PAVER -- CONCRETE SURFACED AIRFIELDS PAVEMENT CONDITION INDEX - continuedFOREWORD - ufc-3-270-050003FOREWORD - continued - ufc-3-270-050004Contents - ufc-3-270-050005Contents - continued - ufc-3-270-050006Contents - continued - ufc-3-270-050007Contents - continued - ufc-3-270-050008Contents - continued - ufc-3-270-050009Acknowledgment - ufc-3-270-050010CHAPTER 1. Introduction - ufc-3-270-050011Inspection ProcedureFigure 1.2. Corrected deduct values for jointed rigid pavementsTable 1.1. Frequently Occurring Problems in Pavement Distress IdentificationFigure 1.3. Jointer rigid pavement survey data sheetChapter 2. DEFINITIONS OF REPAIR OPTIONS - ufc-3-270-050016Chapter 3. DISTRESS 61, BLOWUPOptions for Repair. - ufc-3-270-050018Figure 3.1. Deduct values for Distress 61, BlowupFigure 3.3. Medium-severity blowupChapter 4. DISTRESS 62, CORNER BREAKHow to Count.Figure 4.2. Low-severity corner breakFigure 4.3. Low-severity corner breakFigure 4.5. Medium-severity corner breakChapter 5. DISTRESS 63, CRACKS (LONGITUDINAL, TRANSVERSE, AND DIAGONAL)Reinforced Concrete Severity Levels.Figure 5.2. Low-severity longitudinal crackFigure 5.4. Low-severity diagonal crackFigure 5.6. Medium-severity transverse crackFigure 5.8. High-severity crackFigure 5.10. High-severity crackChapter 6. DISTRESS 64, DURABILITY ("D") CRACKINGOptions for Repair. - ufc-3-270-050034Figure 6.2. Low-severity "D" crackingFigure 6.4. Medium-severity "D" crackingFigure 6.5. Medium-severity "D" cracking occurring in limited area of slabFigure 6.7. High-severity "D" crackingChapter 7. DISTRESS 65, JOINT SEAL DAMAGEOptions for Repair. - ufc-3-270-050040Figure 7.2. Low-severity joint seal damageFigure 7.3. Medium-severity joint seal damageFigure 7.5. High-severity joint seal damage (extensive amount of weed growth)Chapter 8. DISTRESS 66, PATCHING, SMALL (LESS THAN 5 SQUARE FEET (1.5 SQUARE METERS))Options for Repair. - ufc-3-270-050045Figure 8.2. Low-severity small patchFigure 8.3. Low-severity small patchFigure 8.5. Medium-severity small patchChpater 9. DISTRESS 67, PATCHING, LARGE (OVER 5 SQUARE FEET (1.5 SQUARE METERS)) AND UTILITY CUTFigure 9.2. Low-severity patchFigure 9.4. Low-severity utility cutFigure 9.6. High-severity patchChapter 10. DISTRESS 68, POPOUTSFigure 10.1. Deduct values for Distress 68, PopoutsChapter 11. DISTRESS 69, PUMPINGFigure 11.1. Deduct values for Distress 69, PumpingFigure 11.3. Pumping (note stains on pavement)Figure 11.5. PumpingFigure 11.6. Slab count for pumpingChapter 12. DISTRESS 70, SCALING, MAP CRACKING, AND CRAZINGSeverity Levels Applicable to Alkali-Silica ReactionFigure 12.2. Low-severity crazingFigure 12.4. High-severity scalingFigure 12.5. Close-up of high-severity scalingFigure 12.7. High-severity alkali-silica reaction on a grooved pavement. Note the missing pieces, creating FOD, on the lower part of the photographChapter 13. DISTRESS 71, SETTLEMENT OR FAULTINGOptions for Repair. - ufc-3-270-050067Figure 13.3. Low-severity settlement on apronFigure 13.6. High-severity settlementChapter 14. DISTRESS 72, SHATTERED SLAB/INTERSECTING CRACKSOptions for Repair. - ufc-3-270-050071Figure 14.3. Low-severity intersecting cracksFigure 14.5. Medium-severity intersecting cracksChapter 15. DISTRESS 73, SHRINKAGE CRACKSFigure 15.2. Shrinkage crackFigure 15.3. Shrinkage cracksChapter 16. DISTRESS 74, SPALLING (TRANSVERSE AND LONGITUDINAL JOINTS)How to CountFigure 16.2. Low-severity joint spallFigure 16.3. Low-severity joint spallFigure 16.5. Medium-severity joint spallFigure 16.7. High-severity joint spallChapter 17. DISTRESS 75, SPALLING (CORNER)Options for Repair. - ufc-3-270-050084Figure 17.2. Low-severity corner spallFigure 17.3. Low-severity corner spallFigure 17.5. Medium-severity corner spallFigure 17.7. High-severity corner spall