UFC 3-240-02N
16 January 2004
CHAPTER 1
INTRODUCTION
1-1
PURPOSE AND SCOPE. This UFC is comprised of two sections.
Chapter 1 introduces this UFC and provides a listing of references to other Tri-Service
documents closely related to the subject. Appendix A contains the full text copy of the
previously released Military Handbook (MIL-HDBK) on this subject. This UFC serves as
criteria until such time as the full text UFC is developed from the MIL-HDBK and other
sources.
This UFC provides general criteria for repairs and utility service to food
service equipment.
Note that this document does not constitute a detailed technical design,
and is issued as a general guide to the considerations associated with repairs and utility
service to food service equipment.
1-2
APPLICABILITY. This UFC applies to all Navy service elements and
Navy contractors; Army service elements should use the references cited in paragraph
1-3 below; all other DoD agencies may use either document unless explicitly directed
otherwise.
1-2.1
GENERAL BUILDING REQUIREMENTS. All DoD facilities must comply
with UFC 1-200-01, Design: General Building Requirements. If any conflict occurs
between this UFC and UFC 1-200-01, the requirements of UFC 1-200-01 take
precedence.
1-2.2
SAFETY. All DoD facilities must comply with DODINST 6055.1 and
applicable Occupational Safety and Health Administration (OSHA) safety and health
standards.
NOTE: All NAVY projects, must comply with OPNAVINST 5100.23 (series), Navy
Occupational Safety and Health Program Manual. The most recent publication in this
series can be accessed at the NAVFAC Safety web site:
OPNAVINST 5100.23, the requirements of OPNAVINST 5100.23 take precedence.
1-2.3
FIRE PROTECTION. All DoD facilities must comply with UFC 3-600-01,
Design: Fire Protection Engineering for Facilities. If any conflict occurs between this
UFC and UFC 3-600-01, the requirements of UFC 3-600-01 take precedence.
1-2.4
ANTITERRORISM/FORCE PROTECTION. All DoD facilities must
comply with UFC 4-010-01, Design: DoD Minimum Antiterrorism Standards for
Buildings. If any conflict occurs between this UFC and UFC 4-010-01, the requirements
of UFC 4-010-01 take precedence.
1-1