UFC 3-260-11FA
25 May 2005
Type of system
Work required, including field testing and certification
List of Government-furnished equipment
References for the specific system
3-15
DESIGN ANALYSIS
3-15.1
Government-Furnished Conceptual Design Analysis. Either Partial or
Full Criteria project definition includes facility and pavement designs and details in the
RFP drawings and specifications. A Government-prepared conceptual design analysis
should also be included in the RFP documents. This preliminary design analysis should
include all design parameters for the Contractor to advance the design. Appendix B is
an outline for the Government-furnished design analysis that can be used and amended
to define the project. Appendix B is a suggested outline and all information included
may not be available to the RFP preparer.
3-15.2
Contractor-Furnished Design Analysis. The Contractor is required to
build upon the Government-furnished design analysis and submit a design analysis with
each design submittal. An outline for the suggested Contractor-furnished design
analysis is included as an appendix to Section 01018, Design After Award (Appendix K).
3-15.3
Design Analysis Coordination. The RFP preparer should coordinate and
edit, as appropriate, the Government and Contractor design analyses requirements for
each project to assure that a record of all design aspects of the project are included in
at least one of the analyses.
3-16
SUBMITTAL LIST. Appendix C is a list of D-B Contractor submittals
required by Section 00800 and the Division 01 UFGS listed in Figure 1-1, Chapter 1.
RFP preparers should review the list of submittals and eliminate any submittals not
required for the project by editing Section 0800 and the appropriate UFGS.
44