UFC 3-260-11FA
25 May 2005
CHAPTER 6
DESIGN-CONSTRUCTION TEAM EXPERIENCE
6-1
INTRODUCTION. Section 00110 of the RFP, Submission Requirements
and Instructions, typically includes a section on construction team experience. D-B
contracts should require information to be submitted in the proposal that addresses the
experience of the D-B team.
6-2
REFERENCE. Guidance for Firm Fixed-Price Design-Build Construction
Contracts, updated 7/10/02, Chapter 10.
6-3
EXPERIENCE DOCUMENTATION. References and information relative
to experience should be provided by the RFP offeror for those specific types of design
and construction pertinent to the project, such as:
Airfield pavement
Airfield lighting and visual NAVAIDS
Electronic NAVAIDS
Aircraft fueling system
The specific different types of airfield design/construction for which information is
needed should be stated in Section 00110. The forms (Appendixes E, F, G, and H) for
the D-B Contractor's experience as well as the experience records of key personnel
should also be included in Section 00110.
47