MIL-HDBK-1003/3
Page
2.2.6.2 Direct Digital Controls (DDC).............. 11
2.2.6.3 Temperature Control Drawings and
Specifications............................. 11
2.2.6.4 Automatic Control Valves................... 11
2.2.7
Energy Monitoring and Control System (EMCS) 11
2.2.8
2.2.8.1 Indicating Instruments..................... 11
2.2.8.2 Recording Instruments...................... 11
2.2.8.3 Combination Instrument and Controls........ 13
2.2.8.4 Multi-Point Remote Indicators.............. 13
2.2.8.5 Control Board.............................. 13
2.2.9
Metering................................... 14
2.2.10
Piping Systems............................. 14
2.2.10.1 Sizing..................................... 14
2.2.10.2 Pipe Expansion............................. 14
2.2.11
Duct System Design ........................ 14
2.2.11.1 HVAC Systems............................... 14
2.2.11.2 Restriction on Use of Ductwork............. 15
2.2.12
Industrial Ventilation and Exhaust Systems. 15
2.3
Noise and Vibration Control................ 16
2.4
System and Equipment Performance........... 16
2.4.1
Cooling Systems............................ 16
2.4.1.1 Central Air Conditioning Systems........... 16
2.4.1.2 Unitary Air Conditioning Systems........... 16
2.4.1.3 Room Air Conditioning Units................ 17
2.4.1.4 Built-up Systems........................... 17
2.4.2
Heating Systems............................ 17
2.4.2.1 Individual Heating Plants.................. 17
2.4.2.2 Central Heating Plants..................... 18
2.4.2.3 Snow Melting Systems....................... 18
2.4.3
All-Air Systems............................ 18
2.4.3.1 Constant-Volume Systems.................... 18
2.4.3.2 Variable Air Volume (VAV) Systems.......... 19
2.4.3.3 Economizer Cycle........................... 19
2.4.4
Duct, Pipe, and Equipment Insulation....... 19
2.4.5
Computer Programs for Load Calculation..... 19
2.5
Mechanical Room Ventilation................ 20
2.5.1
Self-Contained Breathing Apparatus (SCBA)....20
2.6
3.1
General....................................
23
3.2
All Building Types.........................
23
3.3
Air Force Projects.........................
23
3.4
Tropical Engineering.......................
23
3.5
Electronic Facilities......................
23
3.6
Air Cargo Terminal.........................
29
vi