Home
Download PDF
Order CD-ROM
Order in Print
Home
>
UFGS CRITERIA - index
>
> 3_410_04
DESIGN: INDUSTRIAL VENTILATION
Record of Changes - 3_410_040002
FOREWORD - 3_410_040003
Contents - 3_410_040004
Contents-continued - 3_410_040005
Contents-continued - 3_410_040006
Contents-continued - 3_410_040007
FIGURES - 3_410_040008
TABLES - 3_410_040009
CHAPTER 1. INTRODUCTION - 3_410_040010
CHAPTER 2. GENERAL REQUIREMENTS
DESIGN CRITERIA - 3_410_040012
Fans - 3_410_040013
Exhaust Stacks
Replacement Air - 3_410_040015
Figure 2-2. Decision tree for replacement air design
Plenum Design
CONTROLS - 3_410_040018
Annunciator Panel
OPERATIONAL CONSIDERATIONS - 3_410_040020
SAFETY AND HEALTH CONSIDERATIONS - 3_410_040021
COMMISSIONING
CHAPTER 3. ASBESTOS DELAGGING FACILITIES
EXHAUST AIR
Ductwork - 3_410_040025
Figure 3-3. Exhaust hood for low profile work pieces
Industrial Vacuum System
TABLE 3-1. Minimum Volumes and Vacuum Hose Size for Asbestos Operations
Replacement Air - 3_410_040029
SAFETY AND HEALTH CONSIDERATIONS - 3_410_040030
CHAPTER 4. OTTO FUEL II FACILITIES
Figure 4-2. Series of hood in the MK-46 shop
MK-46 Workbench Hood
Figure 4-4. MK-46 workbench hood
Exhaust Air for MK-48 Ventilated Spaces
MK-48 Afterbody Teardown Hood
MK-48 Workbench Hood
Figure 4-8. MK-48 workbench hood
MK-48 Refueling Hood
Replacement Air - 3_410_040040
Figure 4-12. Vertical distribution method
SYSTEM CONTROLS - 3_410_040042
CHAPTER 5. FIBERGLASS REINFORCED PLASTIC FABRICATION AND REPAIR FACILITIES
DESIGN CRITERIA - 3_410_040044
Plenum Velocity
Figure 5-3. Floor exhaust
Figure 5-4. Spray up booth
Ductwork - 3_410_040048
Vacuum System Design
REPLACEMENT AIR - 3_410_040050
SAFETY AND HEALTH CONSIDERATIONS - 3_410_040051
CHAPTER 6. ABRASIVE BLASTING FACILITIES
Figure 6-1. Downdraft blast enclosure
Figure 6-2. Crossdraft blast enclosure
Air Cleaning Devices
SAFETY AND HEALTH CONSIDERATIONS - 3_410_040056
Hygiene Facilities
CHAPTER 7. WOOD SHOP FACILITIES
Floor Sweeps
SAFETY AND HEALTH CONSIDERATIONS - 3_410_040060
CHAPTER 8. BATTERY MAINTENANCE FACILITIES
Figure 8-1. Ventilation system for battery maintenance facilities
Example
SAFETY AND HEALTH CONSIDERATIONS - 3_410_040064
SAFETY AND HEALTH CONSIDERATIONS-continued
CHAPTER 9. PAINT SPRAY BOOTHS
Exhaust Configurations
Figure 9-1. Walk-in downdraft paint booth
Figure 9-2. Drive-through cross draft paint booth with mechanical replacement air
Paint Spray Booth Exhaust Filtration System
FANS AND MOTORS - 3_410_040071
SYSTEM CONTROLS - 3_410_040072
CHAPTER 10. AIRCRAFT CORROSION CONTROL HANGARS
Figure 10-1. Crossdraft corrosion control hangar
FANS AND MOTORS - 3_410_040075
SYSTEMS CONTROLS
GLOSSARY - 3_410_040077
GLOSSARY-continued - 3_410_040078
GLOSSARY-continued - 3_410_040079
ABBREVIATIONS AND ACRONYMS - 3_410_040080
ABBREVIATIONS AND ACRONYMS-continued - 3_410_040081
ABBREVIATIONS AND ACRONYMS-continued - 3_410_040082
APPENDIX A. REFERENCES - 3_410_040083
APPENDIX A. REFERENCES-continued - 3_410_040084
APPENDIX A. REFERENCES-continued - 3_410_040085
APPENDIX A. REFERENCES-continued - 3_410_040086
APPENDIX B. LETTERS RELATED TO AIRFLOW REQUIREMENTS FOR WALK-IN SPRAY PAINT BOOTHS
Figure B-1. NFESC's letter to OSHA
Figure B-2. OSHA's interpretation
APPENDIX C. LETTERS RELATED TO AIRFLOW REQUIREMENTS FOR CORROSION CONTROL HANGARS
Figure C-1. NFESC Memorandum to OSHA
Figure C-1. NFESC Memorandum to OSHA-continued
Figure C-2. OSHA interpretation
3_410_04