b. Prioritizes projects by SIR and payback
and recommends projects to NAVFACENGCOM for funding.
7.
NAVFACENGCOM - Naval Facilities Engineering
Command:
a. Recommends projects to the Office of the
Secretary of Defense (OSD) for fiscal year funding.
b. Centrally manages ECIP and FEMP funds to
execute selected projects.
c. Develops and issues Navy policies and
guidelines to execute water projects.
d.
Develops Navy-wide execution plans for
water projects.
II.
THE SUBMITTAL PROCESS
A.
COMPONENTS OF THE WATER PROJECT PACKAGE
1. Figure D-2 shows the components that make up a
water project submittal package. There are several different
parts. Assistance in completing each part can be found in
NAVFACINST 11010.44, "Shore Facilities Planning Guide," and
OPNAVINST 11010.20, "Facilities Projects Manual." Sample
submittals can be found in the "Navy Water Conservation Guide for
Shore Activities," published by the NFESC.
2. Cover Letter, Summary Sheet and List of
Attachments. The cover letter should be addressed from your
activity commanding officer to the NFESC (Code 20) with a copy to
your EFD and major claimant. It serves as an introduction to the
submittal package with a brief description of the project.
Following the cover sheet is a summary sheet. The summary sheet
is just that, a summary of the information in the package, with
financial information from the completed Life Cycle Cost (LCC)
analysis spreadsheet. After the summary sheet, a list of the
submittal package contents is included. Notice that there are
distinct attachment categories.