Page
FIGURES
1
Theoretical Relationship Between Load Factor and
Coincidence Factor at U.S. Naval Shore Establishments .......... 20
2
Typical Nonredundant Configuration (UPS) ........................32
3
Typical "Cold" Standby Redundant Configuration (UPS) ............33
4
Typical Parallel Redundant Configuration (UPS) ..................35
5
Conventional Simple-Radial Distribution System ..................43
6
Modern Simple-Radial Distribution System ........................44
7
Modified Modern Simple-Radial Distribution System ...............45
8
Loop Primary-Radial Distribution System .........................46
9
Banked Secondary-Radial Distribution System .....................47
10
Primary Selective-Radial Distribution System ....................48
11
Secondary Selective-Radial Distribution System ..................50
12
Simple Network Distribution System ..............................51
13
Simple Spot-Network Distribution System .........................53
14
Primary Selective Network Distribution System ...................54
15
Primary Selective Spot-Network Distribution System ..............55
TABLES
1
Factors for Individual Facilities by Navy Category Code ..........4
2
Demand Factors for Specific Loads ...............................11
3
Annual Hours Use of Demand for Specific Loads ...................11
4
Academic Building (Code 171-10) Demand and
Load Factor Calculations ........................................12
5
Guides for Selection of Demand Factors ..........................13
6
Guides for Selection of Load Factors ............................15
7
Method of Calculating Coincident Peak Demand ....................18
8
Relationship Between Load Factor and Coincidence Factor .........21
BIBLIOGRAPHY ............................................................56
REFERENCES ..............................................................57
x