See Figures 12 through 18. Provide:
a. Removable, modular, access flooring in the operations, and the
electronic equipment/maintenance rooms with 457.2 mm (18 in.) of
clearance provided between the floor panels and sub floor to
accommodate wiring and insulated piping. See Paragraph 3-3.5.1.
b. Interior and exterior acoustical treatment to attain the Room Criteria
described in Paragraph 3-3.1. Soft textured acoustical wall panels
and movable sound absorbent partitioning in the operations room.
c.
A clear ceiling height of 4.2674 m (14 ft) (finished floor to ceiling) in
the operations area.
d. A tiered seating area in projection auditorium.
e. Radio Frequency (RF) shielding throughout the crypto room. See
MIL-HDBK-1195, requirements must be confirmed by Naval
Electronics Systems Security Engineering Center (NESSEC).
f.
Facility and restroom areas must conform to the UFAS.
g. Cable trays or conduits between the ATCT and the JCF for intra-
facility cabling. The exact dimensions of the cable trough or size
and number of conduits are specified in the BESEP.
2-4.3.1
Windows.
Do not use windows in operations, NTDS/ACDS system, and
equipment/maintenance rooms. Provide insulated glazing for noise reduction in
administrative areas. See Paragraph 3-6.3.6.
2-4.4
Mechanical Requirements.
Design the mechanical system to meet the criteria in Paragraphs 2-2 (RATCF,)
UFC 3-420-01 Design: Plumbing, and MIL-HDBK 1003/3 Heating, Air
Conditioning, and Dehumidification Systems. Provide
a. Automatic thermostatic control.
b. A four-pipe chilled/hot water distribution system with separate air
handlers for each zone or dehumidifying system to work in
conjunction with the air conditioning system.