UFC 4-150-08
01 April 2001
CHAPTER 5
REPORT
5-1
REPORT PURPOSE AND OBJECTIVES. The mooring hardware report
should present the data acquired during the field investigation and the results of the
analysis of that data for the use by berthing officers in the formulation of berthing plans,
scheduling repairs and instituting a mooring hardware load test program.
5-2
REPORT FORMAT. For consistency, all reports should follow the Report
Outline in Figure 5-1. The contents of each section are described below. Each report
should be submitted in MS Word (.DOC), Adobe Acrobat (.PDF) and .html formats. The
quantity of each submittal should be determined in the scope of work. The digital files
should be submitted on CD-ROM media.
5-3
REPORT STRUCTURE
5-3.1
Outline. See Figure 5-1.
5-3.2
Introduction. This section is largely a descriptive overview with sections
including:
1.1
Background/Objectives
1.2
Report Description
1.3
Condition Rating
1.4
Digital Model.
5-3.3
Activity Description. This section has subsections including:
2.1
Location
2.2
Existing Waterfront Facilities along with regional, area, and
facility maps that are the same as in the Underwater
Facilities Inspection Report.
Additional subsections include:
2.3
Inspection Procedure and
2.4
Hardware Numbering System.
In these subsections, the inspection procedure and hardware numbering
system are explained in detail to the reader. In the inspection procedure subsection, the
condition rating system is described as well as the method of locating the position of the
mooring hardware. This will provide the reader with an understanding of the level of
accuracy of the inspection and data. The subsection on the Hardware Numbering
System with an understanding of the system used and why this particular system was
employed, i.e., whether the system was in place or developed for this particular
inspection.
5-3.4
Facilities Inspected. This section constitutes the body of the report and
has the following subsections:
3.1.1
Description
5-1