UFC 4-390-01
23 July 2003
(2)
Electrical switch gear
c) HAZCAT III items include systems, equipment, and
components that failure would compromise the research/test being
conducted. Items include:
(1)
Pumps
(2)
Control valves
(3)
d) HAZCAT IV items include systems, equipment, and
components that are not critical to the research or test
evolution and can be repaired at a convenient time. Items
include:
(1)
Filtration equipment
(2)
Building support systems
2.2.3
Milestone Event Schedule (MES). The certification MES
should include a list of sequential events in the certification
process with estimated dates of completion. The time required
for documentation submissions, technical reviews and deficiency
should be considered in the MES to ensure timely completion of
the certification process prior to the desired system use date.
Figure 3 is an MES for a typical system. It may be reproduced
and filled in and submitted by the applicant. If it does not
meet the needs of a particular system, the applicant may develop
and submit one of original design. The initial MES may be
submitted at the same time the initial SOC is submitted or may be
submitted after the SOC has been approved by the SCA.
Submission of Supporting Documentation. Utilizing the
2.3
approved SOC as a guide, the applicant should prepare and submit
the following documentation in accordance with the MES:
a)
Design review information.
(1)
System drawings
(2)
Design calculations
(3)
Hazard analysis
b)
Construction, fabrication, and assembly information
c)
Quality program information
12