Custom Search
 
  
 
UFC 3-460-03F
21 JANUARY 2003
HCV 362AF-7
10.3.24.5.4
Quarterly
ESO 136AF-9B
10.3.24.5.5
Quarterly
Flush Valve 136AF-5A
10.27.5.6
Quarterly
Hoses
Prior to initial installation and
as determined by the LFM
Offloading
10.3.2.1
supervisor and local
environmental requirements.
Prior to initial installation and
as determined by the LFM
supervisor and local
environmental requirements.
When an API 1529 hose is
Issue
10.3.2.2
delivered with a hydrostatic
certification from the
manufacturer, initial testing is
not required.
Manual Valves
Lubricated plug
10.3.8.1
Quarterly
Gate
10.3.8.2
Quarterly
Non-lubricated plug
10.3.8.3
Quarterly
Ball
10.3.8.4
Quarterly
Meters
Master meter
10.3.12.1
Annually
10.3.12.2
Annually
Drain water
10.3.12.3
Weekly
Miscellaneous
System areas
10.3.1
As required
Surge suppressors
10.3.11
Quarterly
Signs and markings
10.3.13
Annually
Pressure relief
10.3.14
Annually
Service station dispensers
10.3.15
Quarterly
Direct-reading gauge
10.3.16
Annually
DP/PI transmitter
10.3.17
Semi-annually
Cathodic protection
10.3.18
As required
PPE
10.3.19
Annually or before use
103






Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business