- Chapter 1. SCOPE AND RESPONSIBILITY
- Organizational Responsibilities.
- Organizational Responsibilities -
continued
- DESC Responsibilities.
- Chapter 2. PIPELINE SYSTEMS
- Pipeline Testing
- Pipeline Testing - continued
- Operations
- General Pipeline System Components.
- Major Repairs
- Chapter 3. MECHANICAL SYSTEMS
- Figure 3.2. Horizontal Split-Case
Pump.
- Figure 3.3. Vertical Deepwell Turbine
Pump.
- Figure 3.4. Hydraulic Gradient.
- Filter/Separators (F/S)
- Element Replacement for a Vertical F/S
- Element Replacement for a Horizontal
F/S - continued
- Initial Filling of Aviation Turbine
Fuel F/Ss
- Figure 3.5. DBB Valve.
- Figure 3.6. Ball Valve.
- Figure 3.8. Gate Valve.
- Line Strainers
- Ground Product Fueling Systems
- Meters
- Chapter 4. HYDRANT FUELING SYSTEM,
TYPE I (PANERO)
- Figure 4.1. Modified Panero, Type I
Hydrant System.
- Figure 4.2. Nonsurge/Check Valve
(81AF).
- Figure 4.3. F/S Control Valve
(40AF-2A).
- Figure 4.4. Refuel/Defuel Control
Valve (302AF).
- Figure 4.5. Philadelphia Hydrant
Adapter.
- Figure 4.6. Liquid Level Gauge (Liquidometer).
- Figure 4.7. High-Level Shutoff Valve
(124AF).
- Chapter 5. HYDRANT FUELING SYSTEM,
TYPE II (PRITCHARD)
- Figure 5.1. Pritchard, Type II Hydrant
System.
- Figure 5.2. Nonsurge/Check Valve
(81AF-8).
- Figure 5.3. F/S Control Valve
(40AF-2C).
- Figure 5.4. Refueling Control Valve
(90AF-8).
- Figure 5.5. Pressure Relief Valve
(50AF-2).
- Figure 5.6. Defueling Control Valve
(134AF).
- Figure 5.7. Dual Rate-of-Flow Control
Valve (41AF).
- Figure 5.8. Self-Priming Centrifugal
Defueling Pump.
- Figure 5.10. Hydrant Adapter (352AF).
- Figure 5.11. HLSO Valve (129AF).
- Figure 5.12. Combination Dual
Rate-of-Flow Control Valve and Solenoid Valve (41AF-10).
- Figure 5.13. Dual Pressure Relief,
Solenoid Shutoff, and Check Valve (51AF-4).
- High-Pressure CRL Setting
- Chapter 6. CONSTANT-PRESSURE HYDRANT
FUELING SYSTEM, TYPE III (PHILLIPS)
- Receiving and Storage.
- Figure 6.1. Type III,
Constant-Pressure Hydrant Fueling System.
- Figure 6.2. HLSO Valve (413AF-5A).
- Pumphouse
- Figure 6.4. F/S Control Valve
(41AF-2C).
- Figure 6.5. ESO Valve (136AF-9B).
- Figure 6.6. HCV (362AF-8).
- Figure 6.7. BPCV (58AF-9).
- Figure 6.8. D/FV (58AF-9-1).
- Figure 6.9. PCV (58AF-3).
- Product Recovery System.
- Figure 6.10. OV (2129AF).
- Annunciator Alarm
- Operator Controls
- Refueling Condition
- Flush Mode
- Flush Procedures
- Leak Detection.
- Chapter 7. FUEL STORAGE TANKS
- Figure 7.2. Water Draw-Off System.
- Figure 7-3. Water Draw-Off System
Detail
- Types of Tanks.
- Figure 7.4. Floating Pan.
- Figure 7.6. Floating Pan Seal.
- Figure 7.8. Automatic Float Gauge.
- Figure 7.9. Automatic Float Gauge
Head.
- Figure 7.10. Automatic Float Gauge
Floating Pan.
- Figure 7.11. Horizontal Cylindrical
Tank.
- Maintenance of Storage Tanks.
- Belowground Tank Maintenance.
- Figure 7.12. Pressure Vacuum Vent.
- Figure 7.13. Belowground Tank Vent.
- Diking.
- Chapter 8. SAFETY AND ENVIRONMENT
- Safety Precautions and Hazards of
Liquid Petroleum Products
- First Aid.
- Preventing Petroleum Fires.
- Chapter 9. ELECTRICAL GROUNDING AND
BONDING
- Preventing Static Electricity
- Grounding or Bonding Procedures
- Figure 9.1. Aboveground Tank-Grounding
Procedures.
- Figure 9.2. Typical Method of
Grounding Pier, Floating, and Barge Facilities.
- Figure 9.3. Typical Method of Bonding
Ladders on Floating Roof Tanks.
- Figure 9.4. Truck Fill Stand and
Unloading Area Grounding.
- Truck Fill Stand Grounding Assembly.
- Stray Currents.
- Electrical Inspection, Testing, and
Identification Procedures.
- Chapter 10. RECURRING WORK PROGRAM (RWP)
- Table 10.1. Preventive Maintenance
References.
- Table 10.1. Preventive Maintenance
References. - continued
- Table 10.1. Preventive Maintenance
References. - continued
- Storage Tanks.
- Dikes.
- Pumps.
- Surge Suppressors
- Cathodic Protection Systems
- Type I Panero System.
- Type II Modified Pritchard System.
- Emergency Shut-Off Valve (136AF-9B)
- Emergency Shut-Off Valve (136AF-9B)
- Chapter 11. ENTRY FOR INSPECTING,
CLEANING, REPAIRING, AND COATING LIQUID PETROLEUM TANKS
- Tank Entry Personnel Requirements.
- Attendant.
- Tank Entry Coordination
- Emptying the Tank.
- Atmospheric Testing.
- Initial Tank Cleaning from Outside the
Tank.
- Tank Entry.
- Returning to Service.
- Tank Entry Equipment and Personnel
Clothing
- Tank Entry Equipment and Personnel
Clothing - continued
- Tank Entry Equipment and Personnel
Clothing - continued
- Tank Entry Equipment and Personnel
Clothing - continued
- Maintenance and Storage Requirements
- Chapter 12. CONTRACT WORK
- Contract Requirements
- Attachmen 1. GLOSSARY OF REFERENCES
AND SUPPORTING INFORMATION
- References
- References - continued
- Abbreviations and Acronyms
- Abbreviations and Acronyms - continued
- Abbreviations and Acronyms - continued
- Abbreviations and Acronyms - continued
- Terms
- Terms - continued
- Terms - continued
- Terms - continued
- Terms - continued
- Attachement 2. CAPACITY OF VERTICAL
TANKS
- Attachemnts 3. TEST PROCEDURE FOR
SETTING THE PRESSURE DIFFERENTIAL CONTROL (CDHS-3)
- Figure A3.2. Shutoff Valves.
- Attachment 4. SUGGESTED VALVE TAGGING
METHOD
- Attachment 5. PROGRAMMING FUELS
PROJECTS
- Programming Areas
- DESC Project Calls
- Attachment 6. TANK IN-SERVICE
INSPECTION CHECKLIST
- Attachment 6. TANK IN-SERVICE
INSPECTION CHECKLIST - continued
- Attachment 6. TANK IN-SERVICE
INSPECTION CHECKLIST - continued
- Attachment 6. TANK IN-SERVICE
INSPECTION CHECKLIST - continued
- Attachment 6. TANK IN-SERVICE
INSPECTION CHECKLIST - continued
- Attachment 7. RELATED NATO STANAGS/APS/STUDIES
PETROLEUM HANDLING EQUIPMENT WORKING GROUP RESPONSIBILITY
|

|