Tweet |
![]()
Custom Search
|
|
![]() |
||
![]() UFC 3-460-03F
21 JANUARY 2003
Electrical components
10.3.20
Quarterly
Hydrant adapters
10.3.21
Semi-annually
Auto tank gauge
10.3.22
Annually
Strainer
10.3.23
As required
Piping
Pressure test
10.3.6.1
Annually
Hydrostatic test
10.3.6.2
Every 5 years
Exposed piping
10.3.6.3
Corrosion control
10.3.6.3.1
Semi-annually
Identification
10.3.6.3.2
Quarterly
Pumps
General maintenance
10.3.7.1
Quarterly
Lubrication
10.3.7.2
Quarterly or per manufacturer
Product recovery
10.3.7.3
Quarterly
Storage Tanks
Vacuum/pressure vent
10.3.4
Semi-annually
Dikes
10.3.5
Annually
Aboveground
10.3.3.1
Visual inspection
10.3.3.1.1
Monthly
API 653
10.3.3.1.2
Every 10 years
Floating roof/pan
10.3.3.2
Seals and pan
10.3.3.2.1
Monthly
Roof drain
10.3.3.2.2
Monthly
Roof drain (antifreeze)
10.3.3.2.4
As required
Cleaning/inspection
10.3.3.3
Without F/S and coating
10.3.3.3.1
Every 4 years
With F/S or coating
10.3.3.3.2
Every 6 years
With F/S and coating
10.3.3.3.3
Every 8 years
10.3.1. System Areas. Large grass-covered areas around fuel systems will be mowed by BCE
personnel or by service contract. Consult the Maintenance Engineering shop for questions
concerning performance of this task by contract.
FREQUENCY: As required.
10.3.2. Hoses.
104
|
![]() ![]() |
|
![]() |