UFC 1 -300-08
30 JUNE 2004
5-2.6
Check to ensure the sum of the individual facility costs (column 19) equals the
total project cost. List in Project Remarks (Block 28) the total project cost and the
individual total project cost contributions of construction, P&D, S&A, EIP, and any non-
capitalizing costs, i.e., non-footprint demolition. If the sum of the individual facilities on the
1354 does no t equal the project total, explain in the Project Remarks (Block 28).
5-2