178
Appendix B
ACSIM-AR-Funded Items
B.1
General
B.1.1
||content||
\ OMAR funding for furniture and collateral equipment associated
with newly constructed AR training facilities must be identified well in
advance of project execution for budgetary purposes. Physical fitness
equipment will be funded at the same time as furniture, as Government
furnished/ Government-installed (GFGI) equipment. /1/
B.1.2
||content||
\ MCAR funding in general applies to items permanently attached
to the structure which cannot be relocated to other facilities for easy reuse.
Items that can be moved and reused with relative ease are considered
collateral equipment and, as such, will be ACSIM-AR -funded. ACSIM-
AR- funding associated with Contractor Furnished / Contractor Installed
(CFCI) collateral equipment is required at the time of award of the
construction contracts. The bid documents (specifications and drawings)
must clearly define what ACSIM-AR-funded collateral equipment is. The
bid form must have an ACSIM-AR Collateral Equipment line item as part
of the base bid. The bid form shall also narratively define what constitutes
ACSIM-AR Collateral Equipment. The furniture and physical readiness
equipment will be funded approximately six months prior to beneficial
occupancy date (BOD) as Government Furnished / Government Installed
(GFGI) items. /1/
B.2
OMAR-Funded
B.2.1 Kitchen Equipment
Items
Tray and silver dispenser
Cup and glass dispenser
Silver soak pan
Mobile hot food unit
||content||
\ Mobile cold food unit
Warming cabinet
Refrigerator
Freezer
Worktable
Utensil rack
Can opener
Slicer
Worktable, mobile
Mixer
Mixer stand
Pot and pan carts
Shelving
Double tray bussing racks /1/
UFC 4-171-05