UFC 1-300-09N
25 May 2005
Preliminary layout of built-in equipment and systems furniture;
Economic analysis;
Preliminary parametric cost estimate
Responsive schematic design drawings, renderings, and models; and
Total design consensus.
3-4.1.1.6
Documentation: Prepare minutes of the meeting and document all
decisions.
3-4.2
Design Development (30% - 50% Design).
The Design Development phase is the period between Concept Design and 50%
Design when the project is described in a preliminary manner in the design documents.
The earlier stages include: a Basis of Design for each Architectural/ Engineering
discipline included in the project, selection criteria and preliminary calculations, and
preliminary drawings in sufficient detail to support the Basis of Design. Outline
Specifications are also typically required at the earlier design stages. The latter stages
include more detailed preliminary drawings depicting the project design. The design
may be predicated on Standard Design representing detailed contract drawings and
specifications of selective specialized facilities, which are repetitive facility types in the
construction program. Their use is mandatory without change for ammunition facilities,
but others may be modified to meet specific requirements.
3-4.3
Pre-Final Design (100% Design).
The Pre-final Design phase is the period between the 30% - 50% Design Development
phase and Completion of the Design Documents.
The Pre-final (100%) Design includes complete Design Development Drawings and
specifications fully describing the work and incorporating the Design Development
Government review comments, and full Engineering Calculations supporting the
selections/ decisions made in the course of designing the project.
3-4.4
Final Design (100% Design).
The Final Design Contract Documents include the final and complete design
development drawings and specifications. These documents fully describe the project
for either bidding (for Design-Bid-Build projects) or for construction (Design-Build
projects) and have been approved by the various government agents as to having
incorporated all previous pre-final review comments.
3-5
BID/ NEGOTIATION PHASE.
The Bid/ Negotiation Phase is the period from the project Request for Proposal (RFP)
release date until construction contract award. Bid/ Negotiation phase documents
include responses to requests for information (RFI) from the Government, as well as,
supplemental drawings, documents to support changes to the project, and documents
8