UFC 3-260-11FA
25 May 2005
6)
Special subgrade, subbase, and base course preparation for frost
design
8.
DRAINAGE DESIGN
a.
Location of Fueling Aprons and Required Facilities
b.
Location of Deicing Aprons and Required Facilities
c.
Drainage Area to be Served
d.
Location and Description of Future Airfield Use Within Project Drainage
Area
e.
Where Temporary Ponding is Permitted (or Prohibited)
f.
Aircraft Wheel Load for Inlet/Manhole Design
g.
Drainage Areas Contiguous to Project Area that Contribute Storm Flow to
Project
9.
VISUAL AIR NAVIGATION FACILITIES
a.
Airfield Lighting Requirements
1)
Edge lights (location, type, height)
2)
In-pavement lights (location, type)
3)
Control and monitoring systems, including type of controllers
b.
Approach Light Systems (location, type)
c.
Runway End Identifier Lights (REIL)
d.
Precision Approach Path Indicator (PAPI). Identify height group of aircraft
for design.
e.
Constant Current Regulators Identify all lighting and NAVAIDS to be
served by new regulators. List the location of new regulators.
f.
Cabling and Ductwork. Identify the location, size, and number of spare
g.
Airfield Signs and Marker Requirements. All signs shall be frangible and
shall be lighted for nighttime operations.
1)
Mandatory signs
59