UFC 3-260-11FA
25 May 2005
APPENDIX C
DESIGN-BUILD AIRFIELD PROJECT
SUBMITTALS LIST
Specification
Item Description
Submittal Date
Reference
00800 1.2
Small Tool Usage Plan
Closeout
00800 1.9.5
Final Contour Map On Site
Borrow and/or Spoil Areas
As-Built Drawings
At completion of each
00800 1.9.8
definable feature
01780-1.2.1
Final As-Built Drawings
30 days after transfer of
00800 1.9.9
facility
01780 1.2.3
As-Built Specifications
30 days after transfer of
00800 1.9.11
facility
01780 1.2.4
00800 1.10
Equipment-in-Place List
At least 30 days prior to
completion of any segment
01780 1.2.5
Equipment-in-Place List
Draft at time of transfer of
facility Final within 30 days
after transfer of facility
00800 1.10
Maintenance and Parts Data
At least 30 days prior to
completion of facility
00800 1.12
Request for Utility Interruption
14 days prior to planned
interruption
As needed
ID Information (finger prints) of
00800 1.18
Employees
01500 1.1.2
At Quality Control
00800 1.20.3
Name of Company Authorized
Completion Inspection
to do Warranty Work
Equipment Warranty Tag
Before Final Acceptance
00800 1.20.3
01780 1.3.1
00800 1.33
7 day Notice of Soil Treatment
7 days before treatment
00800 1.35
Daily Equipment Report
Daily
61