UFC 4-211-01N
25 October 2004
Corridors Resilient tile
3-22.6.2
Bases.
Administrative spaces, corridors, and spaces with resilient flooring
or carpet Resilient
Spaces with Ceramic tile walls and floors Ceramic
3-22.6.3
Walls. Paint all walls except for pre-finished materials.
3-22.6.4
Ceilings.
Administrative Spaces, All Spaces on Second floor level
Suspended Acoustical
Showers Suspended gypsum wallboard
Corridors Suspended acoustical panels
Equipment rooms, mechanical rooms Exposed construction,
painted.
3-22.7
Additional Architectural Requirements.
3-22.7.1
Exterior.
3-22.7.2
Restrictions on the Use of Uncoated Aluminum
3-22.7.2.1 Seacoast. Aluminum roofing and siding should not be specified for
structures located within 16 km (10 miles) of the seacoast, due to salt deposition
or incrustation from inshore winds and salt-laden atmosphere.
3-22.7.3
Exterior and Interior. The restrictions for the use of preformed
(corrugated) aluminum roofing and siding are applicable also to sandwich panel
and flat sheet construction of unprotected (uncoated) aluminum and to ribbed
aluminum extrusions. Consideration should also be given to the corrosion of
aluminum surfaces on the interior of structures due to salt deposits from salt-
laden air.
3-22.7.4
Incompatible Materials. Surfaces of incompatible metals; wet,
green, or damp wood; wood treated with incompatible preservatives; masonry;
and concrete should be isolated from direct contact with the aluminum by a
heavy coat of alkali-resistant paint or by other approved means
3-22.7.5
Coated Metal. Coated metal roofing and siding should be in
accordance with UFGS-07410N, Metal Roof and Wall Panels.
21