UFC 4-211-01N
25 October 2004
any locations require power for motor operators?)
37.
Will an emergency generator be required? If so, what loads should be
served with emergency power?
38.
a.
Will there be any shops located in the facility? If so, please
indicate.
b.
Type of shops?
c.
Square footage needed for each shop?
d.
The location in the building?
e.
What utilities are required?
f.
Will shops be air-conditioned?
g.
Are floor drains needed?
h.
Crane coverage and hook heights?
i.
Overhead air and electric reels?
j.
Machinery location and utility requirements?
k.
Ceiling heights needed?
l.
Floor coatings required?
m.
Number and size of roll-up doors to outside of hangar.
n.
Give location and number of telephones.
o.
What are the serving requirements for shops? Shipping and
receiving docks? Waste disposal?
39.
Will there be an inspection area? If so, give square footage, location and
utilities required.
40.
Will a cleaning shop be required? If so, give square footage, location,
utilities required. Also, please note any special or heavy drain items such as salt
bath ovens or large ovens. Provide material safety data sheets for all cleaning
products including application rates, methods, durations and frequencies.
41.
Will there be a lunch/break room? If so, please indicate square footage,
location of building, number of employees per shift, if vending machines will be
used, what type of floor, and if drop ceilings will be required.