UFC 4-211-01N
25 October 2004
42.
Will there be a stock room? If so, give square footage requirements,
location in building and utilities required.
43.
Will there be a tool room? If so, give square footage required, location in
building and utilities required.
44.
Will waste oil drains be required? If so, give locations in hangar for
receptacle funnels.
45.
Will there be a drum room? If so, how many drums should it hold? What
types of chemicals are to be stored?
46.
Where are hazardous waste containers to be located?
47.
What type of door security devices will be used? How many and what
locations?
48.
How many entrances to the hangar are required for employees?
49.
Any fluid discharges that may harm metal piping that would require an
acid waste system? (X-ray room, etc.)
50.
Will there be any operational requirements for emergency eye
wash/shower units? (Locations?)
51.
What locations are required for hose reels for water or air? (Overhead,
column mounted or shop areas?)
52.
Any areas other than the hangar bay that will not be air-conditioned?
74