UFC 4-021-01
18 DECEMBER 2002
communications between central control units and autonomous control units (in
individual building systems), and should include redundant (primary and backup)
communication links.
2-6
IMPLEMENTATION OF BASE-WIDE CONTROL SYSTEMS FOR MASS
NOTIFICATION. Implementing a base-wide mass notification system is not required but
offers the advantages of central monitoring, control, and message delivery. An
implementation plan should be the first step in preparing for a base-wide system. The
implementation plan provides a roadmap to the final planned system, and determines
base-specific criteria for evaluating and selecting contractors, manufacturers, and
products. Paragraph 1-6.3 provides more information on developing an implementation
plan. Figure 2-5 shows the logical block diagram for the implementation of a base-wide
control system. Figure 2-6 shows the logical block diagram when Giant Voice is
interfaced to a base-wide control system for mass notification.
Figure 2-5. Base-wide Control System for Mass Notification
Fire Alarm
System
Temporarily
Deactivate Audible
Fire Alarm
Primary Control Center
Speakers
Appliances
Primary
Primary
Communication
Communication
Network
Primary
Network Interface
Interface
Strobes
Comm.
Interface
Primary
Autonomous
Comm.
Control
Link
Battery
Unit
Backup
Primary Central
Displays (Optional)
Control Unit
Backup
Backup
Communication
Communication
UPS
Network
Network Interface
Backup
Notification
Interface
Comm.
Appliance Network
Interface
Conductor Integrity
Conductor Integrity Monitoring
Backup Control Center
Monitoring Required
Required
If Discrete Signals Used
Primary
Local Operator Console
Backup Comm. Link
Communication
Network
Individual Building System
Interface
E042002017GNV
Backup Central
Backup
Control Unit
Communication
Network
Network
UPS
Interface
2-7