MIL-HDBK-1028/3
Section 3:
3.1
Function. These buildings provide facilities and shops for
maintenance of Class 1, Division 1 ammunition such as bombs, mines, warheads,
depth charges, and demolition material. Mine and depth charge rework and
overhaul shops would be included in this grouping.
3.2
Architectural and Structural Requirements
3.2.1
Spaces. Spaces will generally be required as described in
para. 2.2.1. The following spaces shall also be required:
a)
instrument rack storage,
b) instrument test room, and
c) battery maintenance area for mine rework facilities.
3.2.2
Desire. Design requirements described in para. 2.2.2 are ap-
plicable to these facilities.
Battery charging equipment shall be provided for mine rework
facilities in accord with Section 5, Part 6, NAVFAC DM-28.04.
3.3
Mechanical
Requirements
Heating and Air Conditioning, Heating and air conditioning,
3.3.1
including humidity control, shall be provided for instrument test rooms in
accord with NAVFAC DM-3.03. Heating and air conditioning shall be provided
for main shop areas and the office. Humidity control shall be provided for
instrument rack storage for mine rework facilities. Heating only shall be
provided for other spaces. Inside design temperatures, for controlled areas,
shall be 78 F (26 C) with a maximum relative humidity of 50 percent for
cooling and 65 F (18 C) for heating. Maximum relative humidity for the
instrument test rooms and the instrument rack storage shall be as required
for the instruments to be maintained and stored in this area. Refer to
paras. 6-3.2.6 and 6-3.2.7, Volume 1, NAVSEA OP-5, for general guidance.
Ventilation. Ventilation requirements described in para. 2.3.2,
3.3.2
are applicable to these facilities and for the battery charging room in
compliance with Part 6, para. 7.b, DM-28.04.
3.3.3
Plumbing. Plumbing shall be provided in accord with NAVFAC
DM-3.01 and the following:
a) Cold water supplies, with hose-bibb outlets, to main shop
areas for normal floor maintenance. When waterwash type is supplied, cold
water supply to the paint booth. Hose-bibb outlets shall be equipped with
vacuum breakers.
b) Floor drains in main shop areas and a drainage system for the
paint booth when waterwash type is supplied. Connect drains to waste systems
7