MIL-HDBK-1028/3
Defueling/Fueling/Afterbodv Breakdown Room. The requirements for
5.3.2.3
this shop shall be as given in para. 5.3.2.2, except the floor is at normal
building level and there is no Otto fuel storage. Floor sumps shall be 2 ft.
(0.61 m) wide, 4 ft. (1.2 m) long, and 1.5 ft. (.46 m) deep. An emergency
shower and eyewash shall be provided.
Vaults. Vaults shall be provided as shown in Facility Plates and
5.3.2.4
shall meet requirements in OPNAVINST 5510.1G Chapter 14, Department of the
Navy Information and Personnel Security Program Regulation.
5.3.2.5
Vehicle Storage Shed. An emergency shower and eyewash shall be
provided. When provided, battery charging facilities shall be in accordance
with requirements in Part 6, Section 5, NAVFAC DM-28.04.
Paint Shop. Since paint functions may vary, verify requirements
5.3.2.6
with the local using activity. For facilities requiring a complete paint
shop, the roof system shall support a 1,000-pound (453 kg) capacity monorail
system. The pair of bifolding doors will require special closure and weather
stripping to seal around the monorail penetrations. A spray paint booth
should be considered for this shop. The type of exhaust paint containment
selected, dry filter or waterwash, should be based on pollution control costs
(water treatment versus filter disposal) in combination with construction and
operating costs when determining life-cycle costs. Paint storage shall be
provided at the end of the vehicle storage shed.
Due to the small amount of painting and touch up work required at
some Torpedo Intermediate Maintenance Activities, a complete paint shop is
not necessary. Only a small cosmetic area is required. Exterior flammable
locker or storage room should be provided for paint and flammable liquid
storage,
5.3.2.7
Shower and Change Rooms. Shower, eyewash, and change facilities
shall be provided for personnel that work around Otto fuel to meet the
requirements for personnel hygiene in NAVSEA S634O-AA-MMA-010. Shower and
eyewash facilities shall meet ANSI 2358.1 (1981) requirements.
5.3.2.8
Coffee Mess. A kitchen unit with sink, hot and cold water, and
heating equipment shall be provided in the coffee mess room.
5.3.2.9
Exterior Pavement. Exterior pavement shall be in accordance with
NAVFAC DM-5 Series, Civil Engineering.
Mechanical Requirements.
5.4
Mechanical requirements are described
in paras. 5.4.1 through 5.4.5.
5.4.1
Heating and Air Conditioning. Heating, air conditioning, and
humidity control shall be provided in accordance with NAVFAC DM-3.03 for all
spaces except for the paint shop, mechanical equipment room, transformer and
emergency generator room, afterbody shop, Otto fuel ready storage room, and
garage. These spaces shall be provided with heating only. Inside design
conditions for the environmentally-controlled spaces shall be 78 F (26 C)
with a maximum relative humidity of 50 percent for cooling and 65 F (18 C)
for heating.
12