UFC 1-300-02
23 MARCH 2001
variation in estimated quantity when unit price bidding is required. This paragraph is not
used for guide specifications covering building components or for other construction
features when quantities can be reasonably calculated from information included in the
contract.
1.3 SYSTEM DESCRIPTION
This paragraph will be limited to statements describing performance or design
requirements and tolerances of a complete system. Descriptions should be limited to
composite and operational properties to the extent necessary to link multiple
components of a system together, and to interface with other systems.
1.3.1 Design Requirements
Design requirements may include criteria for structural, thermal, acoustical, or other
properties. Tolerances should be stated here only as they apply to the performance of
the complete system. Tolerances of fabrication and installation should be included in
their respective paragraphs under Part 1.
1.3.2 Performance Requirements
Performance requirements may include criteria for structural, thermal, acoustical, or
other properties. Tolerances should be stated here only as they apply to the
performance of the complete system. Tolerances of fabrication and installation should
be included in their respective paragraphs under Part 2.
1.4 SUBMITTALS
\ Submittals must be limited to those necessary for adequate quality control.
Submittal requirements are organized using the following eleven classifications: /3/
SD-01 Preconstruction Submittals
SD-02 Shop Drawings
SD-03 Product Data
SD-04 Samples
SD-05 Design Data
SD-06 Test Reports
SD-07 Certificates
SD-08 Manufacturer's Instructions
SD-09 Manufacturer's Field Reports
SD-10 Operation and Maintenance Data
SD-11 Closeout Submittals
1.5 QUALITY ASSURANCE
1.5 Qualifications
This paragraph includes statements of qualifications for contractor designers,
A-2