manufacturers, fabricators, welders, installers, and applicators of products and
completed work.
1.5.2 Regulatory Requirements
This paragraph includes obligations for compliance with specific code requirements for
contractor-designed items such as wood trusses, labeling such as Underwriters
Laboratory, Inc., and requirements of public authorities such as state highway
departments.
1.5.5 Pre-Installation Conference
This paragraph can be used to specify conferences to coordinate the work or to
sequence related work for sensitive and complex items.
1.6 DELIVERY, STORAGE, AND HANDLING
This paragraph includes the necessary requirements on packing and shipping,
acceptance at site, and storage and protection.
1.7 PROJECT/SITE CONDITIONS
1.7.1 Environmental Requirements
This paragraph establishes any physical or environmental limitations or criteria. Such
conditions might include temperature, weather, humidity, ventilation, and illumination
required for proper installation or application.
1.7.2 Existing Conditions
This paragraph includes statements or references to documents where information may
be found pertaining to such items as existing structures or geophysical reports.
1.8 SEQUENCING AND SCHEDULING
This paragraph includes any special sequencing and scheduling required.
1.9 WARRANTY
This paragraph describes special or extended (more than one year) warranty or bond
covering the conformance and performance of the work of the section. A thorough
understanding of warranties is necessary to develop this paragraph.
1.10 MAINTENANCE
1.10.1 Extra Materials
This paragraph covers items to be furnished to the Government by the Contractor for