UFC 1-300-02
23 MARCH 2001
surfaces.
3.2.2 Surface Preparation
This paragraph describes preparatory work required prior to installation, application, or
erection of primary products.
3.3 ERECTION
This paragraph covers actions required to accomplish a specified unit of work in the
section, and may include requirements necessary for installation of products furnished
under other sections. If products are to be installed according to manufacturer's
instructions, then the manufacturer's instructions should be a required submittal as
evidence of those requirements. Separate paragraphs for each different item, as
appropriate, may be used. The names of the products or the type of work may be
incorporated into the paragraph titles, in which case the wording should reflect the
generic product or terminology used throughout the contract documents.
3.4 INSTALLATION
This paragraph may be used when more appropriate than paragraph ERECTION.
3.5 APPLICATION
This paragraph may be used when more appropriate than paragraph ERECTION.
3.5.1 Special Techniques
This paragraph describes special procedures for incorporating products. These
procedures may include spacings, patterns, or unique treatments. The wording of the
paragraph title should reflect the subject matter
.
3.5.2 Interface with Other Products
This paragraph provides descriptions specific to compatibility and transition to other
materials. This may include incorporating accessories, anchorage, and any special
3.5.3 Tolerances
This paragraph covers allowable variations in application thickness or from indicated
locations.
3.6 FIELD QUALITY CONTROL
3.6.1 Tests
This paragraph defines the tests required for installed or completed work. These tests
A-6