UFC 1-300-09N
25 May 2005
CHAPTER 6 DRAWING AND SPECIFICATION SUBMISSION AND APPROVAL
6-1
ALL PROJECT DESIGN SUBMISSIONS.
6-1.1
General Submission Standards.
6-1.1.1
Hard Copies.
The number of project document hard copies required and the distribution of those
documents at the various submission stages are outlined in the Architect/ Engineer
(A/E) Contract Scope of Work or in the Design-Build RFP. Format hard copy
submissions in accordance with UFC 1-300-02. For paper submittals, use recycled
paper for all submittals unless recycled paper is not available with a quality or at a cost
similar to that of virgin paper.
6-1.1.2
Electronic Submissions.
Make electronic submissions in accordance with UFC 1-300-10N and as required by the
A/E or in-house contract Scope of Work or in the Design-Build RFP.
6-1.2
Approval Authority.
Authority and responsibility for formal approval of drawings and
specifications and RFPs by or for the Commander, NAVFACENGCOM, is
vested in Facility Engineering Command Chief Engineer.
6-2
DESIGN-BID-BUILD PROJECTS SUBMISSIONS.
6-2.1
Submission Standards.
6-2.1.1
Planning Phase Submission.
6-2.1.2
Basis of Design.
Basis of Design general submission requirements for the architectural and engineering
disciplines are outlined in Chapter 8 and 9. The minimum requirements may be
adjusted by the Activity to reflect the project scope and specific design requirements.
6-2.1.3
Conceptual Design.
Conceptual Design submissions include the Basis of Design document as well as the
concept design drawing requirements outlined in the respective design discipline
sections of Chapter 8 or 9.