UFC 3-580-10
14 July 2004
Including changes 12 April 2005
infrastructure includes the currently operating network as well as dark fiber,
copper, and conduits that may be turned over to the NMCI Contractor for their
use. A regional NMCI Coordinator must be identified to facilitate the entire
implementation process. The team consists of the following roles and
organizations:
NMCI Coordinator (a senior DoN representative).
PWC / PWD / FMD / PWO.
Building Managers: Public Works should designate a building
liaison for each building so that multiple users and the NMCI
Contractor team can coordinate early on various facilities issues.
Officer (BCO) / USMC G6.
Space and Naval Warfare Systems Command (SPAWAR) (where
applicable).
Region / Claimant / Activity IT leads / Chief Information Officer
(CIO).
ROICC.
NMCI Contractor.
3-3.2
Preliminary Site Questionnaire. The Preliminary Site
used as a tool for seat conversion, however portions of it are also applicable to
the infrastructure conversion. It is a prerequisite for conducting the Joint
Assessment/Survey (Paragraph 3-4). It is requested that the PSQ be completed
by the claimant prior to the in-brief and contains information such as:
Points of Contact.
Copies of Drawings (hard and electronic if available).
Known Constraints.
Known Issues.
3-3.3
Site In-Brief. Phase 1 ends with an on-site in-brief. The purpose
of the in-brief is to explain the full NMCI conversion process. Participants in the
in-brief generally include:
3-3.3.1
NMCI Contractor
21