PHASE 3 DETAILED SURVEY AND DESIGN. The third phase
is a detailed survey of all facilities in the claimant's current order. This includes
physically visiting each area to validate or resolve any issues that may impact
installation of NMCI Infrastructure.
3-5.1
Team. The NMCI Contractor's sub-contractors are responsible for
contacting the PWC/PWD and conducting the detailed surveys with the base's
Public Works Department. It is vital that Public Works have representation on
this survey to identify and dedicate the required assets including space in the
electrical panel and room availability.
3-5.2
Detailed Survey. Using the High Level Design, the NMCI
Contractor will physically visit each affected portion of the facility to determine:
Power available.
Identify power panels to be used.
Identify and measure space.
Condition of facility.
Buildings/closets that will receive equipment.
Expected type of build-out.
Electrical requirements.
HVAC requirements.
Space requirements.