UFC 3-580-10
14 July 2004
Including changes 12 April 2005
Site Manager.
Claimant Manager.
3-3.3.2
DoN
Command Representative.
Base Command (Infrastructure/Technology) / USMC G6.
Public Works.
ROICC.
Major Claimants in the current delivery order.
3-3.4
Initial Facilities Briefing. Because the formal site in-brief is
focused on the entire NMCI deliverable, it is not possible to focus on the
infrastructure work as part of the brief. At some sites, the morning is set aside for
the general briefing and "break out" sessions are held with various base parties,
such as the Public Works or ROICC during the afternoon. On some bases, these
meetings are on different days. The following topics are covered:
The infrastructure conversion (design and discovery) process.
Typical documentation packages.
Guidance on reviews and the two planned pre-construction
meetings.
The need for escorts and support during the survey and build
phases.
Safety Plan.
Construction standards and best commercial practice.
Local work rules, hours.
Local zoning or criteria restraints.
Environmental concerns: Such as Asbestos, Lead-Based Paint,
State Historic Preservation Offices, Natural/Cultural Resources.
22