DESIGN: AIRCRAFT FIXED POINT UTILITY SYSTEMS
Record of Changes - 4_121_100002
FOREWORD - 4_121_100003
CONTENTS - 4_121_100004
CHAPTER 1. INTRODUCTION - 4_121_100005
REFERENCES-continued - 4_121_100006
APPENDIX A. MIL-HDBK 1028/6A AIRCRAFT FIXED POINT UTILITY SYSTEMS
MILITARY HANDBOOK AIRCRAFT FIXED POINT UTILITY SYSTEMS
FOREWORD - 4_121_100010
MAINTENANCE FACILITIES CRITERIA MANUALS - 4_121_100011
CONTENTS - 4_121_100012
CONTENTS-continued - 4_121_100013
CONTENTS-continued - 4_121_100014
FIGURES - 4_121_100015
TABLES-continued - 4_121_100016
Section 1: INTRODUCTION - 4_121_100017
Section 2: FIXED POINT UTILITY SYSTEMS
Central Equipment Facilities
Utility System Load Determinations
Table 1. Summary of Aircraft Utility Demands
Table 1. Summary of Aircraft Utility Demands-continued
Figure 1. Typical FPUS Site Plan
System Components
Electrical System
Design Requirements - 4_121_100026
Figure 2. FPUS Diversity Curve
Figure 3. Staring Air System
Figure 4. ECS Air System
Figure 5. Preconditioned Cooling Air System
Figure 6. Typical One Line Diagram Central Facilities - ECS System
Figure 7. Typical One Line Diagram Central Facilities Air Start System
Figure 8. Typical Parking Apron Service Point Electrical One-Line Diagram
Figure 9. Typical Hangar Service Point Electrical One-Line Diagram
Figure 10. Feeder Distribution Center
Figure 11. FPUS Electrical Symbols
Figure 12. FPUS Electrical Symbols
Figure 13. Aircraft Service Console Mechanical Schematic
Figure 14. Aircraft Service Mechanical Symbols
Figure 14. Aircraft Service Mechanical Symbols-continued - 4_121_100040
Figure 14. Aircraft Service Mechanical Symbols-continued - 4_121_100041
Section 3: SYSTEM COMPONENT SELECTION
Starting Air System
Table 2. Summary of Design Method for Quantities and Ratings, Central Facilities Equipment Selection, Starting Air System
Table 3. Example of Design Method Starting Air System
Table 4. Summary of Design Method for Quantities and Ratings, Central Facilities Equipment Selection
Table 5. Example of Design Method, Environmental Control Air System
Table 6. Summary of Design Method for Quantities and Ratings, Preconditioned Air Equipment Selection
Table 7. Example of Design Method, Preconditioned Air System
Intercooler
Miscellaneous Equipment and Piping - 4_121_100051
Air Compressor and Auxiliaries
Miscellaneous Equipment and Piping - 4_121_100053
60 Hz Electrical System
Section 4: CENTRAL FACILITIES BUILDING
Structural Requirements - 4_121_100056
Electrical Requirements - 4_121_100057
Section 5: FEEDER DISTRIBUTION CENTERS
Section 6: UNDERGROUND INSTALLATIONS
Section 7: AIRCRAFT SERVICE POINTS
Electrical Equipment Components
400 Hz Components - 4_121_100062
Section 8: HANGAR SERVICE POINTS
Preconditioned Air Equipment Components (Alternate)
400 Hz Components - 4_121_100065
APPENDIX A. METRIC EQUIVALENT CHART
APPENDIX A. METRIC EQUIVALENT CHART-continued - 4_121_100067
APPENDIX A. METRIC EQUIVALENT CHART-continued - 4_121_100068
BIBLIOGRAPHY - 4_121_100069
REFERENCES - 4_121_100070
REFERENCES-continued - 4_121_100071
REFERENCES-continued - 4_121_100072
GLOSSARY - 4_121_100073
STANDARDIZATION DOCUMENT IMPROVEMENT PROPOSAL - 4_121_100074