10
conditions, codes
and specific project
requirements are
major
design considerations in
the development of a total,
integrated
facility.
1.5
1.5.1 The
Using Service (ACSIM-AR) is
responsible for
the
Project
following:
Participant
Responsibilities
1.5.1.1 Determining functional requirements from AR criteria.
1.5.1.2 Approving functional requirements or Tenant requests that
extend beyond the scope of this Guide.
1.5.1.3 Preparing and submitting project documentation (DD
Forms390 and 1391 and supporting data) in accordance with Army
Regulation (AR) 140-483, and providing any updates of these
documents as the project progresses.
1.5.1.4 Approving concept and later designs to certify compliance
with functional requirements.
1.5.1.5 Developing additional information, as required, such as
telephone needs, special electrical requirements and equipment
specifications.
1.5.2 The Design Agency is responsible for the following:
1.5.2.1 Preparing a design that provides for a complete and usable
facility, including all equipment, fixtures and furnishings except those
specifically designated as Government-furnished.
1.5.2.2 Incorporating the functional requirements of the Using
Service and AR Installation into the project design.
1.5.2.3 Developing a design responsive to the criteria in this Guide
and the project documentation, and preparing all submittals required
by the USAR Design Process and Submittal Requirements, and the
project Scope of Work.
1.5.2.4 Justifying, in the project Design Analysis, any issues of
design which do not follow this Guide and other project
documentation.
1.5.2.5 Incorporating the quality standards for the overall design as
described in this Guide and other criteria for the project.