DESIGN: NAVY AND MARINE CORPS BACHELOR HOUSING
Record of Changes - 4_721_100002
FOREWORD - 4_721_100003
CONTENTS - 4_721_100004
CONTENTS-continued - 4_721_100005
CONTENTS-continued - 4_721_100006
CONTENTS-continued - 4_721_100007
CONTENTS-continued - 4_721_100008
FIGURES - 4_721_100009
CHAPTER 1. INTRODUCTION - 4_721_100010
WAIVERS
CHAPTER 2. PROJECT PLANNING
REPAIRS OF EXISTING FACILITIES
NAVY NEW CONSTRUCTION STANDARDS
MARINE CORPS NEW CONSTRUCTION STANDARDS
GROSS BUILDING AREA
GROSS APARTMENT, ROOM, OR MODULE AREA
SITE SELECTION - 4_721_100018
ASBESTOS MITIGATION
HISTORICAL STRUCTURES
FORCE PROTECTION
Exposure to Exterior Explosive Attack
A graphic illustration of the Secure Barracks Concept
Figure 2-1. Secure Barracks Design
WHOLE ROOM CONCEPT
CHAPTER 3. FUNCTIONAL AREA AND SPACE CRITERIA
RESIDENT BULK STORAGE
VENDING AREA (SPACE)
HOUSEKEEPING/JANITORIAL
LOCAL AREA NETWORK SYSTEMS (LAN)
CABLE TELEVISION-continued
CHAPTER 4. THE 1+1E APARTMENT
VARIATIONS
REQUIRED COMMON AREAS
NON-PRIORITY AREAS
Figure 4-1. The I+IE Square Apartment
Figure 4-2. The I+IE Offset Apartment
LOCK REQUIREMENTS - 4_721_100038
CHAPTER 5. NAVY 2+0 ROOM
OPTIONAL COMMON SPACES - 4_721_100040
Multi-Purpose Spaces
LOCK REQUIREMENTS - 4_721_100042
Figure 5-1. The Navy 2+0 Room
CHAPTER 6. MARINE CORPS 2+0 ROOM
OPTIONAL COMMON SPACES - 4_721_100045
DOOR/LOCK REQUIREMENTS
PARKING-continued
Figure 6-1. The Marine Corps 2+0 Room
CHAPTER 7. THE 2+2 MODULE
Master at Arms (9.3 m2 (100 ft2)
LOCK REQUIREMENTS - 4_721_100051
Figure 7-1. The 2+2 Interior Access Module (Room Plan)
Figure 7-2. The 2+2 Exterior Module (Room Plan)
CHAPTER 8. MARINE CORPS OFFICER PLAN
CHAPTER 9. OPEN BAY PLAN
OPTIONAL COMMON AREAS (SPACES)
PARKING - 4_721_100057
CHAPTER 10. FACILITY STANDARDS
PARKING - 4_721_100059
BUS ROUTE ACCESS
FINISHED FLOOR ELEVATION
GRADING
RESIDENTIAL CHARACTER
ACCESSIBILITY REQUIREMENTS
STRUCTURAL SELECTION
HARDWARE AND LOCKS
WALLS AND PARTITIONS
Carpet
EPA Designated Products-continued
Table 10-1 Interior Finishes Schedule: NAVY
Table 10-2 Interior Finishes Schedule: MARINE CORPS
Ceiling Fans
Figure 10-1. Room Elevation
Window Treatments
Signage Manual
CLOSET ACCESSORIES
SUSTAINABLE DESIGN - 4_721_100077
ELECTRICAL - 4_721_100078
ELECTRICAL-continued
LIGHTING - 4_721_100080
REFERENCES - 4_721_100081
REFERENCES-continued - 4_721_100082
REFERENCES-continued - 4_721_100083
REFERENCES-continued - 4_721_100084
REFERENCES-continued - 4_721_100085