UFC 1-300-09N
25 May 2005
h) Updated Electrical Design Check List
8-5.4
Final Design Submittals.
a) The final submission must incorporate the corrections and clarifications noted on the
Pre-Final submittal.
b) Include the Pre-Final submittal reviewer comments with replies
c) Typed Specifications
d) Design Analysis to reflect the final design
e) Calculations, including all updates to substantiate the final design.
8-6
FIRE PROTECTION SUBMITTALS
This section summarizes the items required at each submittal stage for design-bid-build
projects. Not all submittal stages are necessarily required. Contract documents will
outline which submittals are required and information presented below is a guide of the
minimum level of information required at each submittal stage.
8-6.1
Design Development Submittals.
8-6.1.1
Basis of Design.
Complete Basis of Design meeting the requirements as outlined in UFC 3-600-10N,
Design: General Fire Protection Requirements.
8-6.1.2
Drawings.
Provide, as a minimum, the following:
Identify exterior distribution piping and sizes.
Identify location of P.I.V. (if used) and fire hydrants.
Provide a fire hydrant detail.
Provide a detail of the fire main service entrance to the building. Identify a
pipe sleeve in the floor slab. May be shown on fire protection drawings.
Provide fire department vehicular access in accordance with UFC 3-600-
01, Design: General Fire Protection Requirements.
Rated partitions
Show location of Fire Alarm Control Panel (FACP), locations for extender
panels, radio transmitter or master box, all initiating and signaling devices
(including duct smoke detectors) and pump controller on plans,
electromagnetic door holders, single station smoke detectors, fire protection
releasing panels, fire protection system air compressors and fire pump/jockey
pump controllers.