UFC 1-300-09N
25 May 2005
Provide all drawings required to meet the intended design approaches for the project.
As a minimum, provide all noted drawings in UFC 3-600-10N.
8-6.3.2
Specifications.
Submit completed final fire protection specifications supporting the project.
8-6.4
Additional Overseas Submittals Requirements.
Host Nation Life Safety and Building Code analysis.
Comparisons with NFPA Codes and UFC 1-200-01
8-7
ENVIRONMENTAL SUBMITTALS.
Environmental submittals vary with the location and type of project. Consult with the
local command environmental office regarding the specific environmental submittals
necessary for the specific project.
42