Other landscape features such as specialty paving, site furniture,
etc.
Irrigation Plan, when required.
9-2.2.3
Specifications.
Provide preliminary outline specifications in accordance with Chapter 5.
9-2.2.4
Cost Estimate.
Provide a preliminary cost estimate. See NAVFAC Cost Engineering Policy and
9-2.3
Pre-Final Design Submittals.
The intent of the Pre-Final submittal is to provide a complete set of drawings and
specifications. Specifications may be in an edited, or redlined format. The following are
the minimum required of a Pre-Final submittal:
9-2.3.1
Basis of Design.
Resubmit the Basis of Design. Update information as necessary, including sustainable
design validation/certification information required in UFGS 01331 of the project RFP.
9-2.3.2
Drawings.
Provide a complete set of construction documents organized by discipline in
accordance with UFC 3-200-10N.
9-2.3.3
Specifications.
Provide complete specifications in accordance with Chapter 5.
9-2.3.4
Cost Estimate.
Submit complete detailed cost estimate. See NAVFAC Cost Engineering Policy and
9-2.3.5
Annotated Review Comments.
Provide written responses to all government review comments.
9-2.4
Final Design Submittals.
The intent of the Final Submittal is to provide a complete and final set of contract
documents ready for bidding by the government. All government comments must have
been addressed. The following is the minimum required of a Final Submittal:
47